EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
ToddsCruzer
-
Last 10 Project Activities / Entries :
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (43)
Research
- (1)
-
Preparing to Order...
Inspection
- (1)
Rudder
- (3)
Horz. Stab.
- (9)
Elevator
- (8)
-
Completed
-
Disassemble, Prime,...
-
Trim Tab and Teardown
-
Support Tabs and L's
-
Drilling Hinge,...
-
Top Skin
-
Started Elevator
-
Preparing Elevator
Rt O/B Flprn
- (2)
Lt O/B Flprn
- (3)
Rt l/B Flprn
- (1)
Lt I/B Flprn
- (1)
Right Wing
- (14)
Builder Name:
Todd Osborne
-
Project:
Zenair - CH 750 Cruzer
-
VIEW REPORTS
Total Hours:
116.1
Start/Last Date:
Dec 27, 2020 - No Finish Date
Engine:
Viking 130
Panel:
Custom (GlassPack)
Friendly URL:
https://eaabuilderslog.org?s=ToddsCruzer
Home or Last Project Picture
May 08, 2022
Bottom Skins Riveted
- (3 hours)
Category: Right Wing
Final assembly and riveting of bottom skins
Back.jpg
Front.jpg
Apr 24, 2022
Reassembly of Bottom Skins
- (4.2 hours)
Category: Right Wing
Built wing attachment doublers, fit root skin, and cleco'd almost everything back together. Still need to final hole drill the outboard trailing edge and rivet everything together. Most holes have a rivet or cleco in them.
Almost Ready to Rivet 1.jpg
Almost Ready to Rivet 2.jpg
Apr 24, 2022
Reassembly of Bottom Skins
- (4.2 hours)
Category: Right Wing
Built wing attachment doublers, fit root skin, and cleco'd almost everything back together. Still need to final hole drill the outboard trailing edge and rivet everything together. Most holes have a rivet or cleco in them.
Apr 23, 2022
Deburring for Hours!
- (6 hours)
Category: Right Wing
Drilled from bottom skin to spars and spent the rest of the time deburring with my new TX In and Out tool from The YardStore. Nice tool, still a ton of deburring. Primed parts as I went. Final bottom skin assembly is next.
Apr 16, 2022
Leading and Trailing Edges
- (3 hours)
Category: Right Wing
Bottom leading and trailing edge fitting
Leading Edge.jpg
Trailing Edge.jpg
Apr 15, 2022
Bottom Skins
- (1.6 hours)
Category: Right Wing
Drilled inboard and outboard bottom skins
Apr 15, 2022
Fitting Bottoms Skins
- (1.2 hours)
Category: Right Wing
Fit and cleco'd bottom inboard and outboard skins
Down Nose Ribs.jpg
Back.jpg
Front.jpg
In Clecos.jpg
No Overlap on Spar from Outboard Edge 1.jpg
No Overlap on Spar from Outboard Edge 2.jpg
Apr 14, 2022
Lower Skin Started
- (1.3 hours)
Category: Right Wing
Installed strut attachment fitting, tie down connector, and started prepping lower skins
Apr 13, 2022
Wiring for Nav/Strobe Lights
- (1 hour)
Category: Right Wing
Finished drilling and installing wire holders for nav/strobe lights and the wire itself.
Apr 12, 2022
Wiring for Nav/Strobe Lights
- (1.2 hours)
Category: Right Wing
Started wiring for nav/strobe lights. Very hard to get rivets through area where root doublers are, there is not enough A5 rivet depth. Chose to use A6 near root.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.